Operation video

关闭视频
8. Open the drum for inspection

关闭视频
9. Installation - Drum liquid tray oil flow

关闭视频
10. Lock the liquid tray and install the belt cover

关闭视频
11. Power on test machine

关闭视频
Disassembly and horizontal adjustment of the 150 tube transmission part (1)

关闭视频
Disassembly and horizontal adjustment of the 150 tube transmission part (2)
Contact Us
Address: Wangjia Village, Wangshuitai Street, Taizihe District, Liaoyang City
Service Hotline:0419-3304406
Mobile: 15809856001
Mobile: 13841969506
E-mail:txzyjx@163.com
